About
Painter
North light,
slow paint
Jonas trained as a sign painter before art school, which is where the love of flat colour and clean edges comes from. Since 2014 he has worked from one room in Porto, on a small number of paintings at a time, mostly about light on water and objects on tables.

Drying
Week 3

On the easel
No. 15

Study
Board
No. 02 · Process
One painting, four seasons
Every canvas goes through the same four stages. Most of the time is drying time, which is why there are usually four on the go.
01
Prime the linen
Raw linen is stretched by hand and sized with rabbit-skin glue, then three coats of lead white, each sanded back.
Two weeks
02
Block in
The big shapes go down in one or two sittings with thin, lean paint, straight from small studies made on board.
Two mornings
03
Build the layers
Thin glazes, fat over lean, a week apart. Some are scraped back so the colour underneath shows at the edges.
Three to five months
04
Rest and varnish
The finished painting dries for half a year before a soft, removable varnish evens out the sheen.
Six months
No. 03 · On the walls
2014 to now
41
Paintings finished
09
Solo shows
23
Group shows
06
Pigments, no more
Exhibitions
2026
Low Tide
Solo
2025
Still, Mostly
Solo
2024
Northern Rooms
Group
2023
Room With Red
Solo
2021
Table, Window, Sea
Group
2019
First Ochres
Solo
